SITA-Tab Florida HVAC Testing, Adjusting & Balancing for AdventHealth

AdventHealth Tampa Surgical Tower Expansion, Tampa, FL

Owner/Client: AdventHealth
Project Size: 300,000 sq. ft
Project Cost: $256 million
Architect: HuntonBrady
TAB Firm: SITA
Construction Management: Robins & Morton

SITA-Tab provided testing, adjusting, & balancing (TAB) services for the 300,000 sq. ft. surgical tower expansion to AdventHeath Tampa Campus.

The 300,000-square-foot surgical and patient tower located in Tampa, Florida included 24 operating rooms and more than 100 private patient rooms as well as 24 surgical intensive care units, 72 progressive care, and future space to expand. The test and balance (TAB) services included both air and hydronic systems related to these extensive mechanical systems.

SITA-Tab Florida HVAC Testing, Adjusting, & Balancing for USAA Southeast Regional Office (SERO) Campus|(813) 949-1999

Florida HVAC Testing, Adjusting, & Balancing for
USAA Southeast Regional Office (SERO) Campus, Tampa, FL

Owner/Client: USAA
Project Size: 500,000 sq ft.
Architect: Elements
Building Automation Contractor: Siemens Industry, Inc
Mech. Engineer: Tilden, Lobnitz, Cooper
TAB Firm: Southern Independent Testing Agency (SITA)
Construction Management: ABI Construction Services

This multi phase project included mechanical renovations as well as HVAC controls upgrade to the Tampa Office. The Campus includes a seven-story main building, a child development center and several support structures. The building houses a 500+ seat cafeteria with a full-service kitchen, conference rooms, loading docks, drive-in claims area, fitness center, and storage areas.

Florida HVAC testing adjusting and balancing|Florida HVAC testing

Florida HVAC Testing, Adjusting, & Balancing for
Tampa Museum of Art, Tampa, FL

Owner/Client: City of Tampa
Project Size: 66,000 sq ft.
Architect: Stanley Saitowitz Mech.
Engineer: Tilden, Lobnitz, Cooper
TAB Firm: (SITA)
Construction Management: Skanska USA Building, Inc.

TMA constructed a new 66,000-square-foot facility in downtown Tampa. SITA provided HVAC Testing, Adjusting, & Balancing (TAB) services for the 66,000 sf building, which included extensive TAB services related to the ventilation and chilled water systems to ensure a functional building. The museum will become a nationally recognized major art destination and premier venue for residents and visitors. Five expansive interior galleries, one exterior sculpture gallery, and an educational classroom equipped with the latest technology offer visitors a wide variety of visual art experiences.

Florida HVAC testing|Florida HVAC testing adjusting and balancing

Florida HVAC Testing, Adjusting, & Balancing for
Syniverse Corporation, Tampa, FL

Owner/Client: Syniverse Corporation
Project Size: 200,000 sq ft.
Architect: Collman & Karsky Architects Mech.
Engineer: Smith, Seikman & Reed, Inc.
TAB Firm: (SITA)
Construction Management: RENOVATION CONSTRUCTION: Relocation of Corporate Facility

SITA provided HVAC Testing, Adjusting, & Balancing (TAB) services for the 200,000 sf building, which included extensive TAB services related to the ventilation and chilled water systems to ensure a functional building. The project included converting10,000 sf on the first floor of the existing office building to a 6,000 sf network operations center as well as designing 2,000 sf of research and technology laboratories. Special features include raised access floors, Liebert air handling units, gas fire suppression systems, and a variety of sophisticated security and control systems.

Florida test and balance contractor for Moffitt Cancer Center Florida

Florida HVAC Testing, Adjusting, & Balancing for H. Lee Moffitt Cancer Center & Research Institute, Tampa, FL

Project Size: 425,000 sq. ft.
Architect: NBBJ/Hunton Brandy Architects
Engineer: GRG Consulting Engineers
TAB Firm: (SITA)

As a Florida test and balance contractor, SITA-Tab worked on the expansion of the existing 400,000 sf complex consisted of a 175,000 sf clinic addition to the existing facility, and a separate 250,000 sf Research Laboratory Building connected by tunnel and bridge to the Clinic. SITA provided HVAC Testing, Adjusting, & Balancing (TAB) services for the 425,000 sf building, which included extensive TAB services related to the ventilation and chilled water systems to ensure a functional building.

Building Air Barrier Testing

Florida Florida Air Barrier Testing for
Tampa Palms Elementary School, Tampa, FL

Project Size: 60,000 sq. ft.
Engineer: Lyle Engineering Group
Construction Management: Walbridge Aldinger Company

The project consisted of the evaluation of this multiple building campus with air barrier testing and recommendations to the build envelopes. This was done in phases to allow for corrective action to be completed with re-testing and analysis after the renovation.

Florida building commissioning

Florida Building Commissioning for
Grand Central @ Kennedy Blvd. Condominiums Tampa, FL

Commisioning Group:   Test Square

SITA has provided comprehensive commissioning service for the mechanical systems, as well as a functional performance test of appliances related, to the 392-unit condominium complex with two buildings, 12 and 14 stories. One-and two-bedroom units range from 620 to 2,169 square feet; the ground floors will have 125,000 square feet of retail space, with the second floors having 55,000 square feet of office space. The following comprises the major elements of the Florida building commissioning effort: document review of engineering design, commissioning preparation and organization, systems installation inspection, systems performance verification and functional testing, verify and support the correction of deficiencies.